For most homes, the crew is on your roof for 1 to 3 days. But the whole job — from the first inspection to the final walkthrough — usually runs a few weeks. Here's what really sets the clock, so you know what to expect before anyone touches a shingle.
Material is the biggest single factor. Shingles go on fast. Metal, tile and slate are precision work, and rushing them is how roofs fail early. These ranges assume decent weather and a normal-sized roof.
A typical 2,000–2,500 sq ft home. A simple roof with an experienced crew can be finished in one day.
Standing seam and panel systems take roughly 2–3× longer than shingles because every panel and trim piece is measured and aligned.
Tiles are heavy and set by hand. Historic clay tile takes specially skilled tile roofers — and longer, because it's done right.
The slowest system to install. Every slate is hand-placed and fastened by specialists.
About a week for a small building, around three weeks for an average one, and five weeks or more for schools and large facilities.
Steep pitches, lots of hips, valleys and dormers, multiple old layers or tight access all add time.
Specialty materials add lead time before work starts. Standard shingle colors usually arrive within a week. Specialty metal, tile and slate can take 3–6 weeks or more to make and ship. We'll tell you up front.
Install day is the short part. Most of the calendar goes to the steps that come first. Knowing these steps is how you plan around them.
Our trained inspectors check the whole roofing system — not just the shingles — and document everything with photos, often by drone. You get a free report you keep on file.
We go over what we found, walk through material choices, and put the full scope in writing. Take your time here. A good decision matters more than a fast one.
If storm damage is involved, the carrier inspects and approves the claim before work starts, and they set the pace. We document the damage thoroughly and can prove it to anyone who asks, which helps keep things from stalling.
Most local permits take 1–10 business days. Standard materials usually arrive within a week. Specialty systems can take longer. Crew scheduling also depends on the season — after a big storm, everyone's calendar fills up.
The old roof comes off, decking is inspected and repaired, and the new system goes on — underlayment, flashing, ventilation and finish materials. See the roof-type times above.
Magnetic nail sweep, debris haul-off, city inspection where required, and a final walkthrough with you. Then the manufacturer warranty gets registered.
Every roof is different, but here's what a standard home looks like once the crew shows up.
Most delays come from a short list of things. A good team plans for them up front.
Rain, high wind, ice and extreme heat stop work for safety and quality. Weather delays often run 3–14 days.
Rot or water damage under the old roof can't be seen until tear-off. It's usually fixed the same day, but it adds time.
Steep pitches (8/12 and up), dormers, valleys and skylights mean more safety setup and detail work.
Backorders and specialty products can add 1–6 weeks before work begins.
Permit offices and carrier approvals run on their own clocks, especially after a widespread storm.
Two or more layers of old roofing take longer to remove and haul away, and the deck needs a closer look.
Tight lots, fences, landscaping or no driveway for the dumpster slow down setup and cleanup.
After a major hailstorm, crews book up fast. Spring and summer give longer workdays. Late fall and winter bring more weather risk.
A little prep makes install day faster and smoother.
Move cars out so the crew can place the dumpster and stage materials close to the house.
Hammering shakes the walls. Take down mirrors, pictures and shelf items, especially on top floors.
Cover stored items in the attic. Some dust and debris can fall through during tear-off.
It's loud, and nails and debris are falling. Keep pets inside and kids away from the work area.
We're a team of roofing experts working with our roofing partners, Precision Construction and River City Roofing, with 25+ years of hands-on experience in storm restoration nationwide.
We take the time to document your roof completely, so the job is planned right and the damage can be proven to anyone who asks.
You'll know what happens next and when it happens. Call or text the team any time and get a real answer.
From shingles and metal to historic clay tile and commercial flat roofs, licensed Approved Contractors build complete roof systems the right way, not the fast way.
Tell us about your property. A team member will reach out with an honest answer and set up a free inspection if you want one.